Project Summary

Massachusetts Department of Correction
Prison Addition at Bridgewater, MA

This project uses Rotondo Modular's newest building segment, the Maxi-Dorm. Maxi-Dorm is an entirely precast/prestressed high security dormitory building system that can be installed quickly on site offering all the amenities of a permanent solution with the added benefit of relocatability.

Interior View This project is an emergency addition to the Bridgewater, Massachusetts correctional facility. The contract was awarded July 16, 1996 to the Rotondo Team to provide a 300 bed addition to be occupied within 150 days of award. The Rotondo Team won this design-build project in direct competition with five leading steel trailer manufacturers. Not only did the Rotondo Team come out on top with our technical proposal winning the highest point total but we also saved the Commonwealth over 1.5 million dollars, more than a 20% savings over the next lowest bidder.

After the completion of the project a full erection presentation will be available, check back here to see how to receive your copy.

A new series of pictures of this project will be posted to this site in mid January 97. The new set will replace the TeleCAM Archive Images below.


Related Project Information

Archive Images
These pictures were taken with the TeleCAM real-time on-site video system during the main erection phase of the project. A selection from the 250 plus pictures taken is presented here.

Who's Who
A listing of the major organizations, companies and people involved with this project, check it out your name may be there!


For further information contact:

215.257.2255 or opmg@oldcastleprecast.com

Return to Project List