Press Release
   


Back to News

Products

Home

Contact Us

Request Information

 

 

For Immediate Release
Contact: Barbara J. Bogo
Oldcastle Precast Modular Group
215.453.3605
Barbara.bogo@oldcastleprecast.com
http://www.oldcastleprecast.com

864 Precast Cells for New Federal Prison in California

Mendota Federal Correctional Institute, CA- OPMG won the precast contract for the new FCI medium security facility in Fresno County, California. The institute will house 1,152 inmates and will consist of four buildings, three general housing units (GHU) and one special housing unit (SHU). The GHU will each be comprised of 256 correctional cells consisting of four levels of 64 cells on every level; the two-story SHU will consist of 96 correctional cells.

OPMG will be producing the 864 insulated precast concrete prison cells, mezzanine balcony slabs; floor slabs; ceiling slabs and plenum units at their sister facility in Chandler Arizona. The precast prison cells will have an exterior form liner finish and will be outfitted with electrical and lighting fixtures, conduit and plumbing. Dick Pacific is the general contractor and Arrington Watkins is the Architect of Record. Sandra Marks is the OPMG Project Manager for this project.

Oldcastle Precast Modular Group, a leader in precast concrete, operates over 60manufacturing plants in the United States and Canada. For additional information onOldcastle or the products they offer visit their website at http://www.opmg.com or call (215)257 2255.

 

 


 
 
Oldcastle Precast Modular Group
514 Township Line Road
Telford, PA 18969
Phone: 215.257.2255
Fax: 215.453.5813.
E-mail: opmg@oldcastleprecast.com
 
Product Information; Correctional; Educational; Residence Hall;
Company Profile; Special Projects;
Driving Directions; Contact Us; Oldcastle Site; News
MAIN